CLSKW — what changed in the latest 10-Q
A section-by-section comparison of CLSKW's newest periodic SEC filing (10-K/10-Q) against the prior same-form filing: paragraphs added and removed per section, with verbatim excerpts. Purely a deterministic text diff — no similarity scores, no directional read, not investment advice.
Comparing 10-Q · 2026-08-06 vs the prior 10-Q · 2026-05-11
| Section | Outcome | Added | Removed | Minor | Unchanged |
|---|---|---|---|---|---|
| MD&A | Text added/removed | +19 | −19 | ~49 | 36 |
| Market risk (Item 3) | Text added/removed | 0 | 0 | ~2 | 4 |
| Controls & procedures | Text added/removed | 0 | 0 | ~2 | 1 |
| Legal proceedings | No paragraph-level changes | 0 | 0 | 0 | 1 |
| Risk factors | Text added/removed | +25 | 0 | 0 | 1 |
| Other information | Text added/removed | +1 | −1 | 0 | 0 |
Counts are paragraphs; added/removed means text added or removed vs the prior filing — no direction or judgement implied.
Representative excerpts
Up to 5 excerpts of about 300 characters per section, quoted verbatim from the two SEC filings.
MD&A
Text added vs the prior filing · source: 10-Q · 2026-08-06
Leveraging our power optimization, land acquisition, engineering, operations and construction expertise, we have been actively pursuing opportunities to develop portions of our sites and power pipeline for AI, HPC and other advanced data-center hosting and leasing applications. The expansion of AI t…
We continue to evaluate existing properties for potential conversion or dual-use development to support AI and HPC tenants and are advancing design and permitting activities for greenfield data-center sites.
On July 10, 2026, we entered into the Sandersville Lease which is a 20-year triple-net infrastructure lease agreement with two five-year extension options, with a global technology company (the “Tenant”) for 175 MW of critical information technology load at our Sandersville, Georgia campus. Under th…
Following the execution of the Sandersville Lease, management began planning the transition of the power capacity currently supporting bitcoin mining operations at the site exclusively to data center use and expects to fully decommission the existing bitcoin mining operations at the site during fisc…
We maintain real property holdings through our wholly owned and consolidated subsidiaries.
Text removed vs the prior filing · source: 10-Q · 2026-05-11
Bitcoin mining has historically been our principal revenue generating business activity. Factors such as access to specialized mining servers, energy, electricity cost, environmental factors (such as cooling capacity) and location play important roles in mining. As of March 31, 2026, our operating m…
We owned approximately 326,885 miners, of which approximately 224,473 were in service as of March 31, 2026. The remainder primarily consists of new machines that are ready for installation at expansion sites, are under evaluation for relocation, or are awaiting repair. Our miners range in age from 1…
Leveraging our power optimization, land acquisition, engineering, operations and construction expertise, we have been actively pursuing opportunities to develop portions of our sites and power pipeline for AI, HPC and other advanced data-center hosting and leasing applications. The expansion of AI t…
We are evaluating existing properties for potential conversion or dual-use development to support AI and HPC tenants and are advancing design and permitting activities for greenfield data-center sites. On February 27, 2026, we acquired property in Brazoria County, Texas and secured a framework for a…
We maintain real property holdings through our wholly owned and consolidated subsidiaries.
Risk factors
Text added vs the prior filing · source: 10-Q · 2026-08-06
Our data center projects may be subject to new or rapidly evolving regulatory frameworks, and we may face increased public scrutiny or negative publicity as a result of our data center strategy.
Data centers are increasingly scrutinized by federal, state, and local authorities, and have been subject to environmental activists and negative public perception, due to concerns regarding energy consumption, land use, carbon emissions, water usage, environmental impacts, data-sovereignty consider…
We may not realize the anticipated benefits of our HPC and AI data center strategy.
Our data center strategy is in its early stages, and the success of our data center business is uncertain and may not develop as anticipated. The performance of our data center business may be affected by various factors, including the availability, reliability, and timing of power supply; increased…
To date, we have only secured one infrastructure lease agreement with a data center customer (the “Tenant”) at our Sandersville, Georgia, campus (the “Sandersville Lease”). For our data center strategy to be successful, we will need to enter into additional infrastructure lease agreements in a timel…
Other information
Text added vs the prior filing · source: 10-Q · 2026-08-06
During the three months ended June 30, 2026, each of the Company’s officers, as defined in Rule 16a-1(f) under the Securities Exchange Act of 1934, as amended, adopted a separate written trading arrangement intended to satisfy the affirmative defense conditions of Rule 10b5-1(c) under the Exchange A…
Text removed vs the prior filing · source: 10-Q · 2026-05-11
For the three months ended March 31, 2026, none of our directors or officers (as defined in Rule 16a-1(f) under the Exchange Act) adopted, modified, or terminated any contract, instruction or written plan for the purchase or sale of our securities that was intended to satisfy the affirmative defense…
How to read Risk Factors (Item 1A) in a 10-Q
A 10-Q risk-factor section usually takes one of three forms; this page classifies it as one of:
- Pointer — the filer states there have been no material changes and points back to the annual 10-K risk factors; there is no own risk text to compare this quarter.
- Partial update — the filer carves out specific updated risks ("except as set forth below"); the excerpts show exactly what is new this quarter.
- Restated in full — the quarter carries the complete risk-factor text. When the prior quarter was only a pointer there is no prior full text to diff against, so the page flags the section as restated instead.
This describes the filing structure only — it is never a judgement on whether risk went up or down.
Source: text-level diff of the two SEC EDGAR filings · deterministic (no AI-generated content) · for reference only · not investment advice