UEC — what changed in the latest 10-K
A section-by-section comparison of UEC's newest periodic SEC filing (10-K/10-Q) against the prior same-form filing: paragraphs added and removed per section, with verbatim excerpts. Purely a deterministic text diff — no similarity scores, no directional read, not investment advice.
Comparing 10-K · 2026-09-29 vs the prior 10-K · 2025-09-24
| Section | Outcome | Added | Removed | Minor | Unchanged |
|---|---|---|---|---|---|
| Business | Text added/removed | +71 | −94 | ~4 | 3 |
| Risk factors | Text added/removed | +110 | −116 | ~8 | 10 |
| Legal proceedings | Text added/removed | +1 | −4 | 0 | 0 |
| MD&A | Text added/removed | +91 | −63 | ~21 | 15 |
| Market risk (Item 7A) | Text added/removed | 0 | 0 | ~4 | 2 |
Counts are paragraphs; added/removed means text added or removed vs the prior filing — no direction or judgement implied.
Representative excerpts
Up to 5 excerpts of about 300 characters per section, quoted verbatim from the two SEC filings.
Business
Text added vs the prior filing · source: 10-K · 2026-09-29
We are a uranium mining and development company. In August 2024, we re-commenced production at our Christensen Ranch ISR project in Wyoming and, in April 2026, we commenced production at our Burke Hollow ISR mine in South Texas.
We have three ISR mining “hub and spoke” platforms, one in South Texas and two in Wyoming. We operate out of two of these platforms, anchored by fully licensed and operational uranium central processing plants (“CPPs”): our Hobson CPP located in Texas and our Irigaray CPP located in Wyoming. The thi…
We have a significant uranium resource base and have licensed production capacity of approximately 12.1 million pounds per year across our Wyoming and South Texas platforms.
In Canada, we control one of the most extensive land and resource portfolios in the Athabasca Basin, anchored by the Roughrider Project (as defined below) in Saskatchewan.
Through our wholly owned subsidiary, United States Uranium Refining & Conversion Corp. (“UR&C”), we are pursuing domestic refining and conversion capabilities to further strengthen the U.S. nuclear fuel supply chain.
Text removed vs the prior filing · source: 10-K · 2025-09-24
Uranium Energy Corp. is a fast growing, uranium mining company listed on the NYSE American. UEC is working towards fueling the global demand for carbon-free nuclear energy, a key solution to climate change, and energy source for the low-carbon future.
UEC is a pure-play uranium company and is advancing its next generation of low-cost, in-situ recovery (“ISR”) mining uranium projects, and which ISR mining process is expected to reduce the impact on the environment as compared to conventional mining. We have two extraction ready ISR hub and spoke p…
We believe nuclear energy will continue to be an important part of the energy transition and the energy mix of a future low carbon economy. As such, we are focused on scaling our business to meet the future energy needs for nuclear in the U.S. and globally.
Uranium Energy Corp. was incorporated under the laws of the State of Nevada on May 16, 2003 under the name Carlin Gold Inc. During 2004, we changed our business operations and focus from precious metals exploration to uranium exploration in the U.S. Our principal executive office and corporate headq…
We are primarily engaged in uranium mining and related activities, including exploration, pre-extraction, extraction and processing, on uranium projects located in the United States, Canada and the Republic of Paraguay. We utilize ISR mining where possible which we believe, when compared to conventi…
Risk factors
Text added vs the prior filing · source: 10-K · 2026-09-29
An investment in the shares of our common stock or other securities is subject to risks inherent in our businesses and the industries in which we operate. We describe below certain risks and uncertainties, the occurrences of which could have a material adverse effect on us. The risks and uncertainti…
Our operations are capital intensive and we will require significant additional financing to continue with our exploration, pre-extraction and extraction activities on our existing projects and to acquire additional mineral projects. Further, we have a history of negative operating cash flow and net…
Our operations are capital intensive and future capital expenditures are expected to be substantial. We will require significant additional financing to fund our operations, including acquiring additional mineral projects and continuing our exploration, pre-extraction and extraction activities. Hist…
Our reliance on equity and debt financings is expected to continue for the foreseeable future, and their availability whenever such additional financing is required will be dependent on many factors beyond our control including, but not limited to, the market price of uranium, the continuing public …
In August 2024, we restarted uranium extraction at our fully permitted, and past producing, Christensen Ranch Mine ISR operation in Wyoming, and in April 2026, we commenced uranium extraction at our Burke Hollow Mine ISR operation in Texas. The ramp-up phase at these projects will continue while new…
Text removed vs the prior filing · source: 10-K · 2025-09-24
In addition to the information contained in this Annual Report, we have identified the following material risks and uncertainties which reflect our outlook and conditions known to us as of the date of this Annual Report. These material risks and uncertainties should be carefully reviewed by our stoc…
There is no assurance that we will be successful in preventing the material adverse effects that any one or more of the following material risks and uncertainties may cause on our business, prospects, financial condition and operating results, which may result in a significant decrease in the market…
Our operations are capital intensive and we will require significant additional financing to acquire additional mineral projects and continue with our exploration, pre-extraction and extraction activities on our existing projects.
Our operations are capital intensive and future capital expenditures are expected to be substantial. We will require significant additional financing to fund our operations, including acquiring additional mineral projects and continuing with our exploration, pre-extraction and extraction activities …
We are primarily engaged in uranium mining and related activities, including exploration, pre-extraction, extraction and processing, on projects primarily located in the U.S. and Canada. In November 2010, we commenced uranium extraction for the first time at our Palangana Mine utilizing ISR methods …
Legal proceedings
Text added vs the prior filing · source: 10-K · 2026-09-29
As of the date of this Annual Report, other than routine litigation incidental to our business, we are not currently a party to any material pending legal proceedings that management believes would be likely to have a material adverse effect on our financial position, results of operations or cash f…
Text removed vs the prior filing · source: 10-K · 2025-09-24
As of the date of this Annual Report, other than routine litigation incidental to our business or as disclosed below, we are not currently a party to any material pending legal proceedings that management believes would be likely to have a material adverse effect on our financial position, results o…
On or about March 9, 2011, the TCEQ granted our Company’s applications for a Class III Injection Well Permit, Permit Area Authorization and Aquifer Exemption (“AE”) for our Goliad Project. On or about December 4, 2012, the EPA concurred with the TCEQ issuance of the AE permit. With the receipt of th…
A Class I renewal application for the Goliad Project disposal wells was received by the TCEQ on January 23, 2020 and declared administratively complete on April 27, 2020. The application went through technical review and, on September 13, 2022, the executive director of the TCEQ made a decision that…
The Company has had communications and filings with the Ministry of Public Works and Communications (“MOPC”), the mining regulator in Paraguay, whereby the MOPC is taking the position that certain concessions forming part of the Company’s Yuty, Alto Parana and Colonel Oviedo Projects are not eligibl…
MD&A
Text added vs the prior filing · source: 10-K · 2026-09-29
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) provides information that management believes is relevant to an assessment and understanding of the Company’s consolidated financial condition and results of operations. We use certain non-GA…
In August 2024, we restarted uranium extraction at our fully permitted, and past producing, Christensen Ranch Mine ISR operation in Wyoming. During Fiscal 2025, our initial production as part of ramp up yielded 129,966 pounds of precipitated uranium and dried and drummed U3O8 (uranium concentrate). …
At Ludeman, our next ISR project, the previously announced 240-hole delineation drill program was completed. Monitor, injection, and recovery wells for the first wellfield are under construction and being tested for mechanical integrity. Additionally, core samples were collected for laboratory testi…
Uranium recovered from our Christensen Ranch Mine is processed at our Irigaray CPP, which has a licensed production capacity of four million pounds of U3O8 per year. The Irigaray CPP is the hub central to our four fully permitted ISR projects located in the PRB, including our Christensen Ranch Mine …
On August 1, 2025, our Sweetwater Project was designated as a FAST-41 transparency project by the U.S. Federal Permitting Improvement “Steering Council” as part of the implementation of President Trump’s Executive Order on Immediate Measures to “Increase American Mineral Production”. Our first miles…
Text removed vs the prior filing · source: 10-K · 2025-09-24
(Expressed in thousands of U.S. dollars, except per share amounts)
The following discussion summarizes the results of operations for each of our fiscal years ended July 31, 2025, 2024 and 2023 and our financial condition as at July 31, 2025 and 2024, with a particular emphasis on Fiscal 2025, our most recently completed fiscal year.
We utilize ISR mining for our uranium projects where possible which we believe, when compared to conventional open pit or underground mining, requires lower capital and operating expenditures with a shorter lead time to extraction and a reduced impact on the environment. At July 31, 2025, we had no …
In August 2024, we restarted uranium extraction at our fully permitted, and past producing, Christensen Ranch Mine ISR operation in Wyoming. During Fiscal 2025, our initial production as part of ramp up yielded 103,545 pounds and 26,421 pounds of precipitated uranium and dried and drummed concentrat…
Our fully-licensed and 100% owned Hobson processing facility forms the basis for our regional operating strategy in the State of Texas, specifically the South Texas Uranium Belt, where we utilize ISR mining. We utilize a “hub-and-spoke” strategy whereby the Hobson processing facility, which has a ph…
How to read Risk Factors (Item 1A) in a 10-Q
A 10-Q risk-factor section usually takes one of three forms; this page classifies it as one of:
- Pointer — the filer states there have been no material changes and points back to the annual 10-K risk factors; there is no own risk text to compare this quarter.
- Partial update — the filer carves out specific updated risks ("except as set forth below"); the excerpts show exactly what is new this quarter.
- Restated in full — the quarter carries the complete risk-factor text. When the prior quarter was only a pointer there is no prior full text to diff against, so the page flags the section as restated instead.
This describes the filing structure only — it is never a judgement on whether risk went up or down.
Source: text-level diff of the two SEC EDGAR filings · deterministic (no AI-generated content) · for reference only · not investment advice