CTGO — what changed in the latest 10-Q
A section-by-section comparison of CTGO's newest periodic SEC filing (10-K/10-Q) against the prior same-form filing: paragraphs added and removed per section, with verbatim excerpts. Purely a deterministic text diff — no similarity scores, no directional read, not investment advice.
Comparing 10-Q · 2026-08-13 vs the prior 10-Q · 2026-05-14
| Section | Outcome | Added | Removed | Minor | Unchanged |
|---|---|---|---|---|---|
| MD&A | Text added/removed | +19 | −9 | ~20 | 39 |
| Market risk (Item 3) | No paragraph-level changes | 0 | 0 | 0 | 1 |
| Controls & procedures | Text added/removed | 0 | 0 | ~2 | 0 |
| Legal proceedings | Text added/removed | 0 | 0 | ~1 | 0 |
| Risk factors | No material changes reported (points to the 10-K) | — | — | — | — |
| Other information | Text added/removed | 0 | 0 | ~1 | 0 |
Counts are paragraphs; added/removed means text added or removed vs the prior filing — no direction or judgement implied.
Representative excerpts
Up to 5 excerpts of about 300 characters per section, quoted verbatim from the two SEC filings.
MD&A
Text added vs the prior filing · source: 10-Q · 2026-08-13
During the second quarter of 2026, the Peak Gold JV (on a 100% basis) processed 253,494 tons of ore with an average grade of 0.145 ounces (“oz”) per ton, containing approximately 36,760 oz of gold. Gold recovery averaged 80.4%, resulting in approximately 29,500 oz of recovered gold, of which Contang…
During the second quarter of 2026, activities at the Johnson Tract Project focused on planning, resourcing, permitting coordination, and logistical preparations in support of the Company’s planned 2026 field program. On December 1, 2025, the Johnson Tract Critical Metals Project was posted to the Fe…
During the second quarter of 2026, the Company advanced planning activities for the proposed 2026 field season, including solicitation and review of bids for road construction and helicopter support associated with planned access improvements between the Johnson Tract camp and the proposed portal si…
In June 2026, the Company compiled final assay results from the initial phase of the drilling program. The final assay results include several significant gold intercepts from the Lucky Shot vein system, highlighted by 0.17 meters grading 972.10 grams per tonne (“g/t”) gold (“Au”) in drill hole LSU2…
The Lucky Shot surface drill program commenced on June 22, 2026 with the mobilization of two helicopter-supported drill rigs to site. A total of 29 holes across five drilling platforms, totaling approximately 6,800 meters are planned. The program is designed to infill areas of known mineralization w…
Text removed vs the prior filing · source: 10-Q · 2026-05-14
Ability to consummate and realize the anticipated benefits of strategic transactions;
During the first quarter of 2026, activities at the Johnson Tract Project focused on planning, resourcing, permitting coordination, and logistical preparations in support of the Company’s planned 2026 field program. On December 1, 2025, the Johnson Tract Critical Metals Project was posted to the Fed…
During the first quarter of 2026, the Company advanced planning activities for the proposed 2026 field season, including solicitation and review of bids for road construction and helicopter support associated with planned access improvements between the Johnson Tract camp and the proposed portal sit…
Following completion of a new mineral resource estimate ("MRE") expected by the end of the second quarter of 2026, a 40,000 meter surface drilling program is expected to begin in June. The planned $25 million campaign aims to infill known mineral resources at Homestake, Wolf, Dolly Varden, North Sta…
Cook Inletkeeper, Chickaloon Village Traditional Counsel, Center for Biological Diversity.
How to read Risk Factors (Item 1A) in a 10-Q
A 10-Q risk-factor section usually takes one of three forms; this page classifies it as one of:
- Pointer — the filer states there have been no material changes and points back to the annual 10-K risk factors; there is no own risk text to compare this quarter.
- Partial update — the filer carves out specific updated risks ("except as set forth below"); the excerpts show exactly what is new this quarter.
- Restated in full — the quarter carries the complete risk-factor text. When the prior quarter was only a pointer there is no prior full text to diff against, so the page flags the section as restated instead.
This describes the filing structure only — it is never a judgement on whether risk went up or down.
Source: text-level diff of the two SEC EDGAR filings · deterministic (no AI-generated content) · for reference only · not investment advice