LEU — what changed in the latest 10-Q
A section-by-section comparison of LEU's newest periodic SEC filing (10-K/10-Q) against the prior same-form filing: paragraphs added and removed per section, with verbatim excerpts. Purely a deterministic text diff — no similarity scores, no directional read, not investment advice.
Comparing 10-Q · 2026-05-06 vs the prior 10-Q · 2025-11-06
| Section | Outcome | Added | Removed | Minor | Unchanged |
|---|---|---|---|---|---|
| MD&A | Text added/removed | +64 | −76 | ~44 | 42 |
| Market risk (Item 3) | Text added/removed | 0 | 0 | ~1 | 0 |
| Controls & procedures | Text added/removed | 0 | 0 | ~2 | 1 |
| Risk factors | Some risk factors updated | +4 | −17 | ~1 | 0 |
| Other information | No paragraph-level changes | 0 | 0 | 0 | 1 |
Counts are paragraphs; added/removed means text added or removed vs the prior filing — no direction or judgement implied.
Not shown (absent or not faithfully extractable): Legal proceedings
Representative excerpts
Up to 5 excerpts of about 300 characters per section, quoted verbatim from the two SEC filings.
MD&A
Text added vs the prior filing · source: 10-Q · 2026-05-06
Our Technical Solutions segment is focused on uranium enrichment for the nuclear industry and the U.S. government and advanced manufacturing, engineering and other technical services to government and private sector customers. Under a contract with the DOE, our Technical Solutions segment is operati…
Our Technical Solutions segment is committed to the restoration of America’s domestic uranium enrichment production capabilities for LEU and HALEU, in order to play a critical role in meeting U.S. national security and energy security requirements and advancing America’s clean energy, energy securit…
The Company’s work on HALEU began under the HALEU Demonstration Contract, signed with the DOE in 2019 to construct a cascade of 16 AC100M centrifuges in Piketon, Ohio to demonstrate HALEU production. Following the HALEU Demonstration Contract, in November 2022, the DOE awarded the HALEU Operation Co…
In November 2023, the Company announced that it made its first contractual delivery of HALEU to the DOE, completing Phase 1 of the HALEU Operation Contract. As a result of delays in obtaining 5B Cylinders DOE is contractually obligated to provide under the HALEU Operation Contract, Phase 2 of the HA…
On June 17, 2025, the DOE amended the HALEU Operation Contract to divide the first three-year option period into a first option period of one year (“Option 1a”) and a second option period of two years (“Option 1b”). The amendment established a target cost and fee for Option 1a of approximately $99.3…
Text removed vs the prior filing · source: 10-Q · 2025-11-06
Our Technical Solutions segment is committed to the restoration of America’s domestic uranium enrichment production capability in order to play a critical role in meeting U.S. national security and energy security requirements and advancing America’s nonproliferation, energy, and climate objectives.…
The Company’s work on HALEU began under the HALEU Demonstration Contract, signed with the DOE in 2019 to construct a cascade of 16 AC100M centrifuges in Piketon, Ohio to demonstrate HALEU production. The DOE has funded the contract up to $173.0 million with a period of performance that ended Novembe…
On November 10, 2022, the DOE awarded the HALEU Operation Contract to the Company with a base contract value of approximately $150.0 million in two phases through 2024. Phase 1 included an approximately $30.0 million cost-share contribution from Centrus matched by approximately $30.0 million from th…
During November 2023, the Company transitioned to Phase 2 of the HALEU Operation Contract, which included production of 900 kilograms of HALEU UF6 for one production year, as well as continued operations and maintenance of the cascade. Phase 2 included an initial contract value of approximately $90.…
Under the HALEU Operation Contract, DOE is contractually obligated to provide the 5B Cylinders necessary to collect the output of the cascade, but supply chain challenges created difficulties for DOE in securing enough 5B Cylinders for the entire Phase 2 production year. During time periods when 5B …
Risk factors
Text added vs the prior filing · source: 10-Q · 2026-05-06
We are integrating AI technologies into our operations, including through strategic partnerships, which may present business, compliance, regulatory and reputational risks.
We and our business partners are increasingly incorporating AI-driven software tools across various aspects of the Company's operations and business functions, including to streamline workflows and optimize key business processes. While we believe the adoption of AI-driven technologies will enhance …
In addition, AI technologies could be improperly utilized by our employees or by personnel of our business partners, potentially leading to the unauthorized use or disclosure of confidential, proprietary or classified information or unintended, unexpected, or otherwise unforeseen adverse consequence…
If we fail to successfully integrate AI into our business processes or fail to keep pace with rapidly evolving AI technological developments, we may face competitive disadvantages or experience disruptions to our operations or other unintended, unexpected, or otherwise unforeseen adverse consequence…
Text removed vs the prior filing · source: 10-Q · 2025-11-06
We continue to have significant long-term liabilities, including the indebtedness under our 0% Convertible Notes and 2.25% Convertible Notes, which mature in August 2032 and November 2030, respectively.
Our significant long-term liabilities (and other third-party financial obligations) could have important consequences, including:
•making it more difficult for us to satisfy our obligations to lenders and other creditors, resulting in possible defaults on, and acceleration of, such indebtedness or breaches of such other commitments;
•placing us at a competitive disadvantage by making us more vulnerable to react to adverse economic conditions or changes in the nuclear industry;
•hindering our ability to obtain additional financing for future working capital and other general corporate requirements;
How to read Risk Factors (Item 1A) in a 10-Q
A 10-Q risk-factor section usually takes one of three forms; this page classifies it as one of:
- Pointer — the filer states there have been no material changes and points back to the annual 10-K risk factors; there is no own risk text to compare this quarter.
- Partial update — the filer carves out specific updated risks ("except as set forth below"); the excerpts show exactly what is new this quarter.
- Restated in full — the quarter carries the complete risk-factor text. When the prior quarter was only a pointer there is no prior full text to diff against, so the page flags the section as restated instead.
This describes the filing structure only — it is never a judgement on whether risk went up or down.
Source: text-level diff of the two SEC EDGAR filings · deterministic (no AI-generated content) · for reference only · not investment advice