APLD — what changed in the latest 10-K
A section-by-section comparison of APLD's newest periodic SEC filing (10-K/10-Q) against the prior same-form filing: paragraphs added and removed per section, with verbatim excerpts. Purely a deterministic text diff — no similarity scores, no directional read, not investment advice.
Comparing 10-K · 2026-07-29 vs the prior 10-K · 2025-07-30
| Section | Outcome | Added | Removed | Minor | Unchanged |
|---|---|---|---|---|---|
| Business | Text added/removed | +51 | −22 | ~7 | 12 |
| Risk factors | Text added/removed | +75 | −147 | ~43 | 151 |
| Legal proceedings | Text added/removed | +2 | −1 | ~2 | 3 |
| MD&A | Text added/removed | +177 | −149 | ~17 | 20 |
| Market risk (Item 7A) | Text added/removed | 0 | 0 | ~2 | 4 |
Counts are paragraphs; added/removed means text added or removed vs the prior filing — no direction or judgement implied.
Representative excerpts
Up to 5 excerpts of about 300 characters per section, quoted verbatim from the two SEC filings.
Business
Text added vs the prior filing · source: 10-K · 2026-07-29
We are a U.S.-based designer, developer, owner, and operator of large-scale, purpose-built data centers engineered to support high-performance computing (“HPC”) workloads, including artificial intelligence (“AI”), machine learning, and other accelerated-compute applications. We design, build, and op…
Over the past several fiscal years, we have evolved from a company focused on blockchain hosting into a purpose-built HPC data center platform organized around our proprietary AI factory model. Today, our growth, capital allocation, and operating focus are centered on developing and operating HPC da…
We conduct our business through two reportable segments: our HPC data center hosting business (the “HPC Hosting Business”) and our blockchain data center hosting business (the “Data Center Hosting Business”). As discussed further under Note 1 - Business and Basis of Presentation and Note 19 - Busine…
We believe the following strengths position us to capture growing demand for HPC and AI infrastructure:
We originate and control large, contiguous sites with access to substantial, cost-competitive power and the interconnection rights necessary to energize high-density compute at scale. We believe that securing power and interconnection ahead of demand is the principal constraint on new HPC capacity a…
Text removed vs the prior filing · source: 10-K · 2025-07-30
We are a United States ("U.S.") designer, developer, and operator of next-generation data center infrastructure across North America. We provide data center infrastructure solutions to the rapidly growing industries of high-performance computing ("HPC") and artificial intelligence ("AI"). We operate…
Our Data Center Hosting Business provides energized infrastructure services to crypto mining customers. Our custom-designed data centers allow customers to rent space based on their power requirements. We currently serve one crypto mining customer with a remaining contractual term of two and a half …
We currently operate sites in Jamestown and Ellendale, North Dakota, with a total hosting capacity of approximately 286 MW as follows:
Our HPC Hosting Business specializes in designing, constructing, and operating data centers tailored to support high power density applications like HPC and AI.
We are currently building a HPC focused campus comprised of three data centers, which are the first AI focused facilities in our Polaris Forge portfolio, in Ellendale, North Dakota. We are under construction on the first two buildings: a 100 MW and a 150 MW data center, respectively. These facilitie…
Risk factors
Text added vs the prior filing · source: 10-K · 2026-07-29
•We may be unable to complete our data center campuses in a timely manner or within anticipated cost estimates.
•Delays in lease commencement could adversely affect our financial condition and results of operations.
•Our consolidated financial statements include the financial results of ChronoScale.
•We could incur significant costs related to environmental matters, including from government regulation, private litigation, and existing conditions at some of our properties.
•We have substantially concentrated our operations in the state of North Dakota and, thus, are particularly exposed to the regulatory framework and changes in the regulatory environment, market conditions and natural disasters in that state.
Text removed vs the prior filing · source: 10-K · 2025-07-30
•We are at an early stage of development of our business, currently have limited sources of revenue, and may not be profitable in the future.
•Our inability to close the sale of our Cloud Services Business that is currently held for sale and treated as discontinued operations may have a material adverse impact on our business and financial condition.
•We have concentrated our operations in the state of North Dakota and, thus, are particularly exposed to the regulatory framework and changes in the regulatory environment, market conditions and natural disasters in that state.
•Failure to attract, grow and retain a diverse and balanced customer base, including key anchor customers, could harm our business and operating results.
•Our operations could be materially adversely affected by prolonged power outages at any of our facilities.
Legal proceedings
Text added vs the prior filing · source: 10-K · 2026-07-29
On November 15, 2023, a derivative action was filed in the matter styled, Weich v. Cummins, et al., Case No. A-23-881629-C in the District Court of Clark County, Nevada (the “Derivative Lawsuit”). The Weich complaint named as
defendants certain members of the Company’s Board of Directors and its Chief Executive Officer Wesley Cummins and purports to name the Company’s then Chief Financial Officer David Rench as a defendant. The complaint asserted claims for breach of fiduciary duties, corporate waste and unjust enrichmen…
Text removed vs the prior filing · source: 10-K · 2025-07-30
On November 15, 2023, a derivative action was filed in the matter styled, Weich v. Cummins, et al., Case No. A-23-881629-C in the District Court of Clark County, Nevada (the “Derivative Lawsuit”). The Weich complaint named as defendants certain members of the Company’s Board of Directors and its Chi…
MD&A
Text added vs the prior filing · source: 10-K · 2026-07-29
During the fiscal year 2026, we completed the contribution of our Cloud Services Business to ChronoScale (each as defined below), formerly Ekso (as defined below). As a result of this transaction, certain prior-period amounts presented in this Annual Report have been recast to conform to the current…
We are a U.S. designer, developer, and operator of high-performance, sustainably engineered data centers and colocation services for artificial intelligence (“AI”), networking, and blockchain workloads. We provide digital infrastructure solutions to the rapidly growing industries of high-performance…
We consolidate variable interest entities (“VIE”) and voting interest entities ("VOE") where it has been determined that the Company is the primary beneficiary of the entities' operation in accordance with ASC Topic 810, Consolidations. The primary beneficiary is the party that has both the power to…
On May 5, 2026, the Company completed the previously announced divestiture of its cloud business pursuant to that certain Contribution and Exchange Agreement (the “Contribution and Exchange Agreement”), dated February 15, 2026, by and among Ekso Bionics Holdings, Inc. (“Ekso”), APLD Intermediate Hol…
the Cloud Business Combination, Cloud became a wholly owned subsidiary of Ekso, Ekso changed its name to ChronoScale Corporation (“ChronoScale”) and ChronoScale’s common stock began trading on the Nasdaq Capital Market under the symbol “CHRN” on May 5, 2026. Immediately following the closing of the …
Text removed vs the prior filing · source: 10-K · 2025-07-30
We are a U.S. designer, developer, and operator of next-generation digital infrastructure across North America. We provide digital infrastructure solutions to the rapidly growing industries of high-performance computing ("HPC") and artificial intelligence ("AI"). As of May 31, 2025, we operated in t…
Our Data Center Hosting Business builds and operates data centers to provide energized space to crypto mining customers.
As of May 31, 2025, our 106 MW facility in Jamestown, North Dakota and our 180 MW facility in Ellendale, North Dakota continue to operate at full capacity. This business segment accounts for all of the revenue we generated from our continuing operations for the fiscal year ended May 31, 2025.
We are currently building two HPC focused data center facilities to provide 100 MW and 150 MW, respectively, of capacity in Ellendale, ND. These facilities are being designed and purpose-built to host high-density GPU architecture or other HPC applications, such as artificial intelligence, natural l…
As previously disclosed and as further discussed below, on January 13, 2025, APLD HPC Holdings LLC (“APLDH”), our indirect wholly owned subsidiary, entered into a Unit Purchase Agreement (as amended, the “Unit Purchase Agreement” or “UPA”) for our HPC Hosting Business with MIP VI HPC Holdings, LLC, …
How to read Risk Factors (Item 1A) in a 10-Q
A 10-Q risk-factor section usually takes one of three forms; this page classifies it as one of:
- Pointer — the filer states there have been no material changes and points back to the annual 10-K risk factors; there is no own risk text to compare this quarter.
- Partial update — the filer carves out specific updated risks ("except as set forth below"); the excerpts show exactly what is new this quarter.
- Restated in full — the quarter carries the complete risk-factor text. When the prior quarter was only a pointer there is no prior full text to diff against, so the page flags the section as restated instead.
This describes the filing structure only — it is never a judgement on whether risk went up or down.
Source: text-level diff of the two SEC EDGAR filings · deterministic (no AI-generated content) · for reference only · not investment advice