IDA — what changed in the latest 10-Q
A section-by-section comparison of IDA's newest periodic SEC filing (10-K/10-Q) against the prior same-form filing: paragraphs added and removed per section, with verbatim excerpts. Purely a deterministic text diff — no similarity scores, no directional read, not investment advice.
Comparing 10-Q · 2026-07-30 vs the prior 10-Q · 2026-04-30
| Section | Outcome | Added | Removed | Minor | Unchanged |
|---|---|---|---|---|---|
| MD&A | Text added/removed | +87 | −66 | ~54 | 70 |
| Market risk (Item 3) | Text added/removed | 0 | 0 | ~6 | 3 |
| Controls & procedures | Text added/removed | 0 | 0 | ~3 | 0 |
| Risk factors | No paragraph-level changes | 0 | 0 | 0 | 1 |
| Other information | Text added/removed | 0 | 0 | ~1 | 0 |
Counts are paragraphs; added/removed means text added or removed vs the prior filing — no direction or judgement implied.
Not shown (absent or not faithfully extractable): Legal proceedings
Representative excerpts
Up to 5 excerpts of about 300 characters per section, quoted verbatim from the two SEC filings.
MD&A
Text added vs the prior filing · source: 10-Q · 2026-07-30
◦In March, Idaho Power filed a CPCN request for a 222 MW natural gas-fueled facility, with an expected in-service date in 2029, and for a 430 MW natural gas-fueled facility, with an expected in-service date in 2030. As of the date of this report, the CPCN request remains subject to regulatory approv…
◦Also in March, the IPUC approved Idaho Power's agreement to purchase the output of an 80 MW solar facility, with a scheduled online date of June 2027, and Idaho Power's CPCN request for 167 MW of natural gas-fueled generating capacity next to the existing Bennett Mountain power plant, with an expec…
◦In April, Idaho Power, jointly with co-owner PacifiCorp, filed a CPCN request for Segment E-8 for the GWW transmission line, with an expected in-service date for the entire segment in 2030 or later. As of the date of this report, the CPCN request remains subject to regulatory approval.
◦In June, Idaho Power filed an application with the IPUC for an order approving a 20-year PPA with Bluebird Solar Project LLC, supplying up to 200 MW of output to Idaho Power, along with a 20-year energy storage system tolling agreement for 100 MW of dispatchable energy storage capacity. Both are ex…
◦The conversion of unit 2 at the North Valmy power plant from coal to natural gas was completed in June, ending all coal-fired generation at the plant.
Text removed vs the prior filing · source: 10-Q · 2026-04-30
◦In March, the IPUC approved Idaho Power's agreement to purchase the output of an 80 MW solar facility, with a scheduled online date of June 2027.
◦In March, the IPUC approved Idaho Power's CPCN request for 167 MW of natural gas-fueled generating capacity next to the existing Bennett Mountain power plant, with an expected in-service date in 2028.
◦In March, Idaho Power filed a CPCN request with the IPUC for a 222 MW natural gas-fueled facility, with an expected in-service date in 2029 and a 430 MW natural gas-fueled facility, with an expected in-service date in 2030. As of the date of this report, both requests are pending IPUC approval.
◦In April, Idaho Power, jointly with co-owner PacifiCorp, filed a CPCN request for Segment E-8 for the GWW transmission line, which would create up to 2,000 MW of additional transmission capacity and the ability to interconnect new generation resources across Idaho.
The following is a summary of Idaho Power's net income, net income attributable to IDACORP, and IDACORP's earnings per diluted share (in thousands of dollars and shares, except earnings per share amounts):
How to read Risk Factors (Item 1A) in a 10-Q
A 10-Q risk-factor section usually takes one of three forms; this page classifies it as one of:
- Pointer — the filer states there have been no material changes and points back to the annual 10-K risk factors; there is no own risk text to compare this quarter.
- Partial update — the filer carves out specific updated risks ("except as set forth below"); the excerpts show exactly what is new this quarter.
- Restated in full — the quarter carries the complete risk-factor text. When the prior quarter was only a pointer there is no prior full text to diff against, so the page flags the section as restated instead.
This describes the filing structure only — it is never a judgement on whether risk went up or down.