OKLO — what changed in the latest 10-Q
A section-by-section comparison of OKLO's newest periodic SEC filing (10-K/10-Q) against the prior same-form filing: paragraphs added and removed per section, with verbatim excerpts. Purely a deterministic text diff — no similarity scores, no directional read, not investment advice.
Comparing 10-Q · 2026-08-07 vs the prior 10-Q · 2026-05-12
| Section | Outcome | Added | Removed | Minor | Unchanged |
|---|---|---|---|---|---|
| MD&A | Text added/removed | +62 | −35 | ~13 | 36 |
| Market risk (Item 3) | Text added/removed | 0 | 0 | ~2 | 0 |
| Controls & procedures | Text added/removed | 0 | 0 | ~2 | 1 |
| Legal proceedings | No paragraph-level changes | 0 | 0 | 0 | 1 |
| Risk factors | No material changes reported (points to the 10-K) | — | — | — | — |
| Other information | Text added/removed | +2 | 0 | ~1 | 0 |
Counts are paragraphs; added/removed means text added or removed vs the prior filing — no direction or judgement implied.
Representative excerpts
Up to 5 excerpts of about 300 characters per section, quoted verbatim from the two SEC filings.
MD&A
Text added vs the prior filing · source: 10-Q · 2026-08-07
Related to our first Aurora powerhouse, the DOE and the INL have completed the environmental compliance process addressing the DOE requirements for site characterization. This process, resulting in an Environmental Compliance Permit, marks a milestone as we advance our plans to deliver the first com…
In addition, a Notice of Intent to Award has been issued by the Defense Logistics Agency-Energy on behalf of the Department of the Air Force, tentatively selecting Oklo to provide electricity and heat to Eielson Air Force Base outside of
Fairbanks, Alaska. An Aurora-derived powerhouse is planned for the base and will be designed to integrate electric power and steam delivery, including at least 5 MWe.
Our robust pipeline of potential customer engagements spans a number of industries. For example, we have signed non-binding letters of intent with Equinix, Inc. ("Equinix"), Diamondback E&P LLC ("Diamondback Energy"), and Prometheus Hyperscale (formerly Wyoming Hyperscale White Box LLC) ("Prometheus…
In June 2026, we entered into a letter of intent with Centrus Energy Corp. ("Centrus") under which Centrus would supply sufficient domestically produced HALEU to support multiple years of fuel requirements for up to five Aurora powerhouses, with deliveries expected to begin in 2029. The letter of in…
Text removed vs the prior filing · source: 10-Q · 2026-05-12
We have been tentatively selected to provide electricity and heat to Eielson Air Force Base outside of Fairbanks, Alaska. Our robust pipeline of potential customer engagements spans a number of industries. For example, we have signed non-binding letters of intent with Equinix, Inc. ("Equinix"), Diam…
In addition to deployment milestones, we have made significant progress in our nuclear fuel recycling and fuel fabrication efforts and in securing fuel. The DOE has reviewed and approved our Safety Design Strategy, Conceptual Safety Design Report, Nuclear Safety Design Agreement, and Preliminary Doc…
In December 2025, we completed a fast-spectrum plutonium criticality experiment in collaboration with Los Alamos National Laboratory under the DOE’s reactor pilot program ("RPP"). During the experiment, the system was taken critical and operated through controlled power maneuvers and transients, ena…
Fuel is a significant input to enable us to build and operate our powerhouses at scale and generate expected returns. The cost environment for various sources of fuel (including HALEU) has increased significantly in recent years, which is why we are implementing a diversified fuel strategy. Tariffs,…
On January 7, 2026, we announced the execution of a DOE Other Transaction Agreement ("OTA") to support the design, construction, and operation of a radioisotope pilot plant (“Radioisotope Pilot Facility”) under the DOE RPP. The execution of the OTA marks the transition from project selection and pla…
Other information
Text added vs the prior filing · source: 10-Q · 2026-08-07
On April 2, 2026, William Goodwin, the Company’s Chief Legal and Strategy Officer, materially modified the Rule 10b5-1 trading arrangement previously adopted by him on December 15, 2025 and previously disclosed in the Company’s Annual Report on Form 10-K for the fiscal year ended December 31, 2025 (…
For purposes of Rule 10b5-1(c) under the Exchange Act, the April 2, 2026 modification constituted a termination of the Prior Trading Arrangement and the adoption of a new Rule 10b5-1 trading arrangement (the “Modified Trading Arrangement”) intended to satisfy the affirmative defense conditions of Ru…
How to read Risk Factors (Item 1A) in a 10-Q
A 10-Q risk-factor section usually takes one of three forms; this page classifies it as one of:
- Pointer — the filer states there have been no material changes and points back to the annual 10-K risk factors; there is no own risk text to compare this quarter.
- Partial update — the filer carves out specific updated risks ("except as set forth below"); the excerpts show exactly what is new this quarter.
- Restated in full — the quarter carries the complete risk-factor text. When the prior quarter was only a pointer there is no prior full text to diff against, so the page flags the section as restated instead.
This describes the filing structure only — it is never a judgement on whether risk went up or down.
Source: text-level diff of the two SEC EDGAR filings · deterministic (no AI-generated content) · for reference only · not investment advice