TALO — what changed in the latest 10-Q
A section-by-section comparison of TALO's newest periodic SEC filing (10-K/10-Q) against the prior same-form filing: paragraphs added and removed per section, with verbatim excerpts. Purely a deterministic text diff — no similarity scores, no directional read, not investment advice.
Comparing 10-Q · 2026-08-05 vs the prior 10-Q · 2026-05-06
| Section | Outcome | Added | Removed | Minor | Unchanged |
|---|---|---|---|---|---|
| MD&A | Text added/removed | +43 | −27 | ~13 | 37 |
| Controls & procedures | Text added/removed | 0 | 0 | ~2 | 1 |
| Legal proceedings | No paragraph-level changes | 0 | 0 | 0 | 2 |
| Risk factors | Some risk factors updated | +13 | 0 | ~1 | 0 |
| Other information | Text added/removed | 0 | 0 | ~1 | 0 |
Counts are paragraphs; added/removed means text added or removed vs the prior filing — no direction or judgement implied.
Not shown (absent or not faithfully extractable): Market risk (Item 3)
Representative excerpts
Up to 5 excerpts of about 300 characters per section, quoted verbatim from the two SEC filings.
MD&A
Text added vs the prior filing · source: 10-Q · 2026-08-05
Genovesa — During the fourth quarter of 2025, we temporarily shut-in production from the Genovesa well, which ties back to the non-operated Na Kika facility, due to a failure of the surface-controlled subsurface safety valve. We successfully completed the Genovesa workover and returned the well to p…
Monument — As recently announced by the operator, the first Monument development well was successfully drilled to its total measured depth of 32,250 feet and encountered approximately 250 feet of net pay confirming pre-drill expectations. Drilling is set to commence on the second development well fo…
Daenerys — The Daenerys appraisal well was spud on July 1, 2026, and operations are progressing according to plan. Results are expected by year-end 2026.
The following encompasses recent developments since the filing of our Quarterly Report on Form 10-Q for the three months ended March 31, 2026.
Pending Coulomb and Na Kika Acquisition — On June 30, 2026, we entered into a purchase and sale agreement to acquire certain oil and gas properties and related assets in the Mississippi Canyon area of the Gulf of America, including interests in the Na Kika and Coulomb Deepwater producing assets for …
Text removed vs the prior filing · source: 10-Q · 2026-05-06
Cardona — We successfully drilled and completed the Cardona well in late 2025. Production commenced in early 2026, with the well flowing to our Pompano facility. Talos is the operator and holds a 65% working interest.
CPN — We successfully drilled the CPN well and finished well completion operations in the first quarter of 2026, with first production from the well expected in the third quarter of 2026. Talos is the operator and holds a 65% working interest.
Monument — Drilling operations have commenced and continuous drilling and completion activities are planned throughout 2026. First production is expected between 20-30 MBoepd gross and remains on track to commence by late 2026. Monument is a large Wilcox oil discovery in Walker Ridge blocks 271, 272…
The following encompasses recent developments since the filing of our 2025 Annual Report:
Incremental Mexico Equity Sale — On December 16, 2024, we entered into an agreement to sell an additional 30.1% equity interest in Talos Mexico to Zamajal, S.A. de C.V., a subsidiary of Grupo Carso, S.A.B. de C.V., for $49.7 million in cash consideration with an additional $33.1 million payment cont…
Risk factors
Text added vs the prior filing · source: 10-Q · 2026-08-05
We may not consummate the pending transactions, including the Coulomb and Na Kika Acquisition or the Offshore Mexico Farm-In Transaction on the terms currently contemplated or at all.
We may not consummate various pending transactions on the timeline and terms currently contemplated or at all. For example, the Coulomb and Na Kika Acquisition is subject to the satisfaction of customary closing conditions. These conditions include, but are not limited to, (i) the expiration or term…
If (i) the consummation of the Coulomb and Na Kika Acquisition does not occur on or before the Outside Date, or (ii) prior thereto, the Company notifies the trustee that it will not pursue the consummation of the Coulomb and Na Kika Acquisition, the Company will be required to redeem $175.0 million …
Additionally, the Offshore Mexico Farm-In Transaction is subject to approval by Mexico’s Secretaría de Energía and the National Anti-trust Commission of Mexico. There can be no assurance that closing conditions will be satisfied or that pending transactions, including the Coulomb and Na Kika Acquisi…
Failure to complete the Pending Transactions on the terms currently contemplated or at all could have a material adverse effect on our results of operations, cash flows and financial position.
How to read Risk Factors (Item 1A) in a 10-Q
A 10-Q risk-factor section usually takes one of three forms; this page classifies it as one of:
- Pointer — the filer states there have been no material changes and points back to the annual 10-K risk factors; there is no own risk text to compare this quarter.
- Partial update — the filer carves out specific updated risks ("except as set forth below"); the excerpts show exactly what is new this quarter.
- Restated in full — the quarter carries the complete risk-factor text. When the prior quarter was only a pointer there is no prior full text to diff against, so the page flags the section as restated instead.
This describes the filing structure only — it is never a judgement on whether risk went up or down.
Source: text-level diff of the two SEC EDGAR filings · deterministic (no AI-generated content) · for reference only · not investment advice