XE — what changed in the latest 10-Q
A section-by-section comparison of XE's newest periodic SEC filing (10-K/10-Q) against the prior same-form filing: paragraphs added and removed per section, with verbatim excerpts. Purely a deterministic text diff — no similarity scores, no directional read, not investment advice.
Comparing 10-Q · 2026-08-13 vs the prior 10-Q · 2026-06-04
| Section | Outcome | Added | Removed | Minor | Unchanged |
|---|---|---|---|---|---|
| MD&A | Text added/removed | +49 | −27 | ~31 | 32 |
| Market risk (Item 3) | Text added/removed | 0 | 0 | ~3 | 1 |
| Controls & procedures | Text added/removed | +3 | −3 | ~2 | 5 |
| Legal proceedings | Text added/removed | 0 | 0 | ~1 | 0 |
| Risk factors | No material changes reported (points to the 10-K) | — | — | — | — |
| Other information | Text added/removed | +1 | −2 | 0 | 0 |
Counts are paragraphs; added/removed means text added or removed vs the prior filing — no direction or judgement implied.
Representative excerpts
Up to 5 excerpts of about 300 characters per section, quoted verbatim from the two SEC filings.
MD&A
Text added vs the prior filing · source: 10-Q · 2026-08-13
In the U.S., growing power demand from industrial expansion, manufacturing reshoring, data center buildout, and broader electrification is creating use cases for scalable, firm, clean baseload power that we believe SMRs like the Xe-100 can uniquely deliver. Industrial companies face a near-term repl…
Additionally, the market for SMRs has not yet been established, as we are one of the pioneers in the industry. As we scale and continue to invest in the capabilities of our SMRs and procure long lead-time items and engineering activities, our future revenue depends on a growing number of jurisdictio…
X-energy is responsible for the funding and is eligible to receive 50% reimbursement for this funding through the ARDP program. These two ARDP-related programs are not tied to Dow’s funding requirements. Finally, for the construction of the Xe-100 plant, Dow is responsible for the funding of the Xe-…
Dow’s current funding commitments are representative of a typical energy project development process. At present, Dow’s funding is released as project milestones are reached; however, X-energy has no obligation to move forward with the project without funding from Dow. As we are currently in prelimi…
If a final investment decision is made, Dow is expected to continue to be responsible for the funding of the construction of the Xe-100 plant, which is eligible under the ARDP grant for 50/50 cost share. If Dow does not make a final investment decision with respect to the Seadrift project, X-energy …
Text removed vs the prior filing · source: 10-Q · 2026-06-04
In the U.S., growing power demand from data center buildout, industrial expansion, manufacturing reshoring, and broader electrification is creating use cases for scalable, firm, clean baseload power that we believe SMRs like the Xe-100 can uniquely deliver. AI-driven computing requirements are expec…
Dow’s current funding commitments are representative of a typical energy project development process. At present, Dow’s funding is released as project milestones are reached; however, X-energy has no financial obligation to construct the plant without Dow’s funding. As we are currently in preliminar…
If final investment decision is made, Dow is expected to continue to be responsible for the funding of the construction of the Xe-100 plant, which work is eligible under the ARDP grant for 50/50 cost share. If Dow does not make a final investment decision with respect to the Seadrift project, X-ener…
We were selected by the DOE as an awardee under the ARDP in 2020 for one of two “demonstration” projects in the United States, and it is particularly critical to our success. The ARDP is structured as a 50/50 cost-share between the DOE and its private sector awardee for eligible costs, intended to r…
$1.1 billion, as well as recent additional appropriations of $3.1 billion to ARDP, some incremental portion of which we expect to be allocated to X-energy. DOE’s ability to receive the not-yet-appropriated portion of the ARDP is subject to the political process, which is inherently unpredictable and…
Controls & procedures
Text added vs the prior filing · source: 10-Q · 2026-08-13
Our management, including our principal executive officer and principal financial officer, does not expect that our disclosure controls or our internal control over financial reporting will prevent all errors and all fraud. A control system, no matter how well conceived and operated, can provide onl…
Our management, with the participation of our Chief Executive Officer and Chief Financial Officer, conducted an evaluation of the effectiveness of the design and operation of our disclosure controls and procedures, as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act of 1934 (the “Exch…
As of June 30, 2026, management is actively engaged in remediating the material weakness described above. In order to remediate this material weakness, we have taken and plan to take the following actions:
Text removed vs the prior filing · source: 10-Q · 2026-06-04
Our management, with the participation of our Chief Executive Officer and Chief Financial Officer, conducted an evaluation of the effectiveness of the design and operation of our disclosure controls and procedures, as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act of 1934 (the “Exch…
In order to remediate this material weakness, we have taken and plan to take the following actions:
Our management, including our principal executive officer and principal financial officer, do not expect that our disclosure controls or our internal control over financial reporting will prevent all errors and all fraud. A control system, no matter how well conceived and operated, can provide only …
Other information
Text added vs the prior filing · source: 10-Q · 2026-08-13
On June 9, 2026 and June 14, 2026, respectively, Daniel Gross, our Chief Financial Officer, and Laura Garcia, our Chief Accounting Officer, each adopted a sell-to-cover instruction that constitutes a “Rule 10b5-1 trading arrangement” intended to satisfy the affirmative defense of Rule 10b5-1(c)(1) o…
Text removed vs the prior filing · source: 10-Q · 2026-06-04
During the three months ended March 31, 2026, none of our directors or officers (as defined in Rule 16a-1(f) under the Exchange Act) adopted, modified or terminated a “Rule 10b5-1 trading arrangement” and/or “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408 of Regulation S-K…
On June 1, 2026, our Compensation and Culture Committee approved a grant that resulted in (i) 246,665 restricted stock units and (ii) 332,615 options granted to Daniel Gross, our Chief Financial Officer. The awards are subject to the terms of our 2026 Equity Incentive Plan.
How to read Risk Factors (Item 1A) in a 10-Q
A 10-Q risk-factor section usually takes one of three forms; this page classifies it as one of:
- Pointer — the filer states there have been no material changes and points back to the annual 10-K risk factors; there is no own risk text to compare this quarter.
- Partial update — the filer carves out specific updated risks ("except as set forth below"); the excerpts show exactly what is new this quarter.
- Restated in full — the quarter carries the complete risk-factor text. When the prior quarter was only a pointer there is no prior full text to diff against, so the page flags the section as restated instead.
This describes the filing structure only — it is never a judgement on whether risk went up or down.
Source: text-level diff of the two SEC EDGAR filings · deterministic (no AI-generated content) · for reference only · not investment advice