NPWR 最新10-Q变化
将 NPWR 最新的定期申报(10-K/10-Q)与上一份同类型申报逐章节对比:每个章节新增/删除的段落数与原文摘录。全部为确定性文本对比——无相似度评分、无方向判断、非投资建议。
对比:10-Q · 2026-05-11 与上一份 10-Q · 2025-11-13
| 章节 | 结果 | 新增 | 删除 | 微调 | 未变 |
|---|---|---|---|---|---|
| 管理层讨论与分析 | 文字有新增/删除 | +27 | −46 | ~10 | 3 |
| 市场风险(第3项) | 无段落级文字变化 | 0 | 0 | 0 | 1 |
| 控制与程序 | 文字有新增/删除 | 0 | 0 | ~2 | 1 |
| 法律诉讼 | 无段落级文字变化 | 0 | 0 | 0 | 4 |
| 风险因素 | 文字有新增/删除 | +1 | −7 | 0 | 0 |
| 其他信息 | 文字有新增/删除 | +1 | −2 | 0 | 0 |
计数单位为段落;"新增/删除"指相对上一份文件新增/删除的文字,不含方向或好坏判断。
代表性摘录
每个章节最多 5 条、每条约 300 字符的原文摘录,直接来自两份 SEC 文件。
管理层讨论与分析
相对上期新增的文字 · 来源:10-Q · 2026-05-11
Net Power is progressing its first clean firm power hub at the Project Permian site in West Texas. The project is being sized to accommodate up to one gigawatt of clean firm power generation capacity. We intend for Phase I of the project to utilize readily available gas turbines paired with Entropy’…
We are a development stage company and our historical results may not be indicative of our future results, particularly considering the recent shift in the anticipated timing of our technology development of the Oxy-Combustion Cycle and the introduction of the clean gas power plant product incorpora…
financial results, as well as the components of such results, may not be comparable to our historical or future results of operations.
Comparison of the Three Months Ended March 31, 2026 to the Three Months Ended March 31, 2025
General and administrative expenses consist primarily of personnel-related expenses associated with our general and administrative organization and professional fees for legal, accounting, information technology, and other consulting services. General and administrative expenses increased by $0.2 mi…
相对上期删除的文字 · 来源:10-Q · 2025-11-13
Specifically, on July 4, 2025, President Trump signed into law the One Big Beautiful Bill Act (“OBBBA”), a large piece of tax and spending legislation that has specific material effects for Net Power’s intended SN1 project and future pipeline. The OBBBA preserved the core elements of the 45Q tax cre…
Additionally, the Trump Administration has started the process to change regulations on new natural gas-fired power plants. Currently, the U.S. Environmental Protection Agency’s regulations for new gas turbines that run above a 40% capacity factor require such facilities to meet a 90% capture rate b…
In 2024, Net Power began purchasing initial long-lead materials for its first utility-scale power plant (“SN1”) with the intention of locating SN1 in the Permian Basin of West Texas (“Project Permian”). However, after completing the front-end engineering and design (“FEED”) process in December 2024,…
During the third quarter of 2025, we completed a market analysis of our oxy-combustion technology, identifying slower than anticipated acceptance and deployment of the technology from previous expectations. The value engineering efforts on Project Permian identified significant cost reductions, but …
In response to unprecedented demand growth for low-cost, firm power generation solutions with viable pathways to decarbonize, we have broadened the scope of our business to include the generation of power using natural gas turbines paired with post-combustion carbon capture technology. In order to p…
风险因素
相对上期新增的文字 · 来源:10-Q · 2026-05-11
As a smaller reporting company, we are not required to provide the information called for by this Item. However, for a discussion of the material risks, uncertainties and other factors that could have a material effect on us, please refer to Part I, Item 1A. “Risk Factors” in our Annual Report.
相对上期删除的文字 · 来源:10-Q · 2025-11-13
In addition to the information set forth in this Form 10-Q, you should carefully consider the risk factors disclosed in our Annual Report. The information presented below updates, and should be read in conjunction with, the risk factors and information disclosed in our Annual Report. Except as set f…
We have incurred and may in the future incur losses due to an impairment in the carrying value of our long-lived assets.
In September 2025, we determined that a triggering event had occurred requiring an impairment assessment of our Developed Technology Asset Group, which resulted in the recognition of an impairment loss of $1,095.8 million for the three and nine months ended September 30, 2025.
This impairment loss is a reflection of the current market for our technology that has resulted from information gathered by management regarding the projected cost of Project Permian and the ability of our technology to compete with other prevailing energy technologies on both a cost and efficiency…
exposed to additional impairment charges in future periods, which could adversely affect the Company’s business and financial results.
其他信息
相对上期新增的文字 · 来源:10-Q · 2026-05-11
During the three months ended March 31, 2026, none of our directors or “officers” (as such term is defined in Rule 16a-1(f) under the Exchange Act) adopted or terminated a “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement” (as each term is defined in Item 408(a) of Regulation…
相对上期删除的文字 · 来源:10-Q · 2025-11-13
On November 12, 2025, we, through our wholly-owned subsidiary, entered into an Equipment Supply Agreement with Relevant Power Solutions, LLC (“RPS”) to purchase two modular gas turbine generator sets with nominal gross power of approximately 30 megawatts each (“Gas Turbine Sets”) for use in our prop…
During the three months ended September 30, 2025, none of our directors or “officers” (as such term is defined in Rule 16a-1(f) under the Exchange Act) adopted or terminated a “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement” (as each term is defined in Item 408(a) of Regula…
如何读 10-Q 的风险因素(第 1A 项)
10-Q 的风险因素章节有三种常见形态,本页按其一分类展示:
- 指向(pointer) — 公司仅声明"无重大变化"并指向年度 10-K 的完整风险因素;本季没有自己的风险文本可对比。
- 部分更新(partial) — 公司写明"除下述外无重大变化",只更新部分风险;摘录展示的正是本季新增的内容。
- 全文重述(restated) — 本季重新给出完整风险因素。若上一季只是"指向",则无法逐段对比,本页会将其标为"本季全文重述"。
这只是对文件结构的客观描述,不构成对风险高低的判断。
数据来自 SEC EDGAR 两份申报文件的文本级对比 · 确定性计算(无 AI 生成内容)· 仅供参考 · 非投资建议