OPAL 最新10-Q变化
将 OPAL 最新的定期申报(10-K/10-Q)与上一份同类型申报逐章节对比:每个章节新增/删除的段落数与原文摘录。全部为确定性文本对比——无相似度评分、无方向判断、非投资建议。
对比:10-Q · 2026-05-11 与上一份 10-Q · 2025-11-07
| 章节 | 结果 | 新增 | 删除 | 微调 | 未变 |
|---|---|---|---|---|---|
| 管理层讨论与分析 | 文字有新增/删除 | +67 | −91 | ~20 | 23 |
| 市场风险(第3项) | 文字有新增/删除 | 0 | 0 | ~1 | 0 |
| 控制与程序 | 文字有新增/删除 | 0 | 0 | ~2 | 1 |
| 法律诉讼 | 文字有新增/删除 | 0 | 0 | ~1 | 0 |
| 风险因素 | 部分风险因素更新 | 0 | 0 | ~1 | 0 |
| 其他信息 | 文字有新增/删除 | 0 | 0 | ~1 | 0 |
计数单位为段落;"新增/删除"指相对上一份文件新增/删除的文字,不含方向或好坏判断。
代表性摘录
每个章节最多 5 条、每条约 300 字符的原文摘录,直接来自两份 SEC 文件。
管理层讨论与分析
相对上期新增的文字 · 来源:10-Q · 2026-05-11
natural gas to power their fleets. These revenue sources are presented in our consolidated statements of operations under the following captions:
Project development and startup costs includes certain development costs such as legal fees, consulting fees for joint venture structuring, royalties to the landfill owner, fines, settlements, site lease expenses and certification costs on our RNG projects under construction. Additionally, we also i…
(1) Design Capacity for RNG facilities is measured as the volume of feedstock biogas that the facility is capable of accepting at the inlet and processing during the associated period. Design Capacity is presented as our ownership share (i.e., net of joint venture partners’ ownership) of the facilit…
(2) Inlet Design Capacity Utilization is measured as the Volume of Inlet Gas for a period, divided by the total Design Capacity for such period. The Volume of Inlet Gas varies over time depending on, among other factors, (i) the quantity and quality of waste deposited at the landfill, (ii) waste man…
(4) Utilization of Inlet Gas is measured as RNG Fuel Volume Produced divided by the Volume of Inlet Gas. Utilization of Inlet Gas varies over time depending on availability and efficiency of the facility and the quality of LFG (i.e., concentrations of methane, oxygen, nitrogen, and other gases). We …
相对上期删除的文字 · 来源:10-Q · 2025-11-07
As of September 30, 2025, we owned and operated 26 projects, 11 of which are RNG projects and 15 of which are Renewable Power Projects. As of that date, our RNG projects in operation had a design capacity of 8.8 million MMBtus per year and our Renewable Power Projects in operation had a nameplate ca…
On October 6, 2025, the Company's Atlantic RNG facility commenced commercial operations. This project represents approximately 0.3 million MMBtu for Opal's 50% ownership share of annual design capacity.
In October 2025, the Company began construction of the CMS Concord RNG facility in North Carolina. This project represents approximately 0.7 million MMBtu for Opal's 70% ownership share of annual design capacity.
change at any time and such changes may negatively impact our growth strategy." Government regulations have become increasingly stringent and complying with changes in regulations may result in significant additional operating expenses.
Project development and start up costs includes certain development costs such as legal fees, consulting fees for joint venture structuring, royalties to the landfill owner, fines, settlements, site lease expenses and certification costs on
如何读 10-Q 的风险因素(第 1A 项)
10-Q 的风险因素章节有三种常见形态,本页按其一分类展示:
- 指向(pointer) — 公司仅声明"无重大变化"并指向年度 10-K 的完整风险因素;本季没有自己的风险文本可对比。
- 部分更新(partial) — 公司写明"除下述外无重大变化",只更新部分风险;摘录展示的正是本季新增的内容。
- 全文重述(restated) — 本季重新给出完整风险因素。若上一季只是"指向",则无法逐段对比,本页会将其标为"本季全文重述"。
这只是对文件结构的客观描述,不构成对风险高低的判断。
数据来自 SEC EDGAR 两份申报文件的文本级对比 · 确定性计算(无 AI 生成内容)· 仅供参考 · 非投资建议