PEG 最新10-Q变化
将 PEG 最新的定期申报(10-K/10-Q)与上一份同类型申报逐章节对比:每个章节新增/删除的段落数与原文摘录。全部为确定性文本对比——无相似度评分、无方向判断、非投资建议。
对比:10-Q · 2026-05-05 与上一份 10-Q · 2025-11-03
| 章节 | 结果 | 新增 | 删除 | 微调 | 未变 |
|---|---|---|---|---|---|
| 管理层讨论与分析 | 文字有新增/删除 | +49 | −80 | ~33 | 49 |
| 市场风险(第3项) | 文字有新增/删除 | 0 | 0 | ~2 | 8 |
| 控制与程序 | 文字有新增/删除 | 0 | 0 | ~1 | 1 |
| 法律诉讼 | 无段落级文字变化 | 0 | 0 | 0 | 1 |
| 风险因素 | 无段落级文字变化 | 0 | 0 | 0 | 1 |
| 其他信息 | 文字有新增/删除 | +9 | −3 | ~1 | 1 |
计数单位为段落;"新增/删除"指相对上一份文件新增/删除的文字,不含方向或好坏判断。
代表性摘录
每个章节最多 5 条、每条约 300 字符的原文摘录,直接来自两份 SEC 文件。
管理层讨论与分析
相对上期新增的文字 · 来源:10-Q · 2026-05-05
For the years 2026-2030, our regulated capital investment program is estimated to be in a range of $22.5 billion to $25.5 billion. We expect these capital investments to result in a compound annual growth rate in our regulated rate base in a range of 6.0% to 7.5% from year-end 2025 to year-end 2030.…
Modernization Program (GSMP) and Clean Energy Future (CEF)-EE program, as these programs are expected to continue beyond their currently approved time frames. The upper end of our capital investment range includes potential incremental investments to address continued demand growth and other investm…
In November 2025, the BPU issued an Order approving PSE&G’s GSMP III program, authorizing $1.05 billion of capital investment to replace 525 miles of high pressure cast iron gas mains and unprotected steel mains, with cost recovery through three periodic rate adjustments as portions of the investmen…
At PSEG Power, we seek to produce low-cost electricity by efficiently operating our nuclear generation assets, mitigate earnings volatility through hedging and the PTC mechanism, and support public policies that preserve these existing carbon-free base load nuclear generating plants. During the firs…
Our hedging strategy continues to incorporate an estimated range of risk reduction impacts from the PTCs on our nuclear generation portfolio while retaining the ability to benefit when market pricing exceeds the level at which we would receive PTCs. As of December 31, 2025, we expect that our curren…
相对上期删除的文字 · 来源:10-Q · 2025-11-03
For the years 2025-2029, our regulated capital investment program is estimated to be in a range of $21 billion to $24 billion. We expect these capital investments to result in a compound annual growth rate in our regulated rate base in a range of 6% to 7.5%. The regulated capital investments represe…
In 2023, the BPU approved a two-year extension of our current GSMP II program to replace at least 400 miles of cast iron and unprotected steel mains and services in our gas system. The GSMP II program extension provides for main replacement through December 2025 plus trailing services replacement an…
In October 2024, the BPU issued an Order approving the settlement of PSE&G's distribution rate case with new rates effective October 15, 2024. The Order provided for a $17.8 billion rate base, a 9.6% return on equity for PSE&G’s distribution business and a 55% equity component of its capitalization …
At PSEG Power, we seek to produce low-cost electricity by efficiently operating our nuclear generation assets, mitigate earnings volatility through the PTC mechanism and hedging, and support public policies that preserve these existing carbon-free base load nuclear generating plants. During the firs…
Our hedging strategy continues to incorporate an estimated range of risk reduction impacts from the PTCs on our nuclear generation portfolio while retaining the ability to benefit when market pricing exceeds the phase out threshold. As of September 30, 2025, we expect that our hedged position for 20…
其他信息
相对上期新增的文字 · 来源:10-Q · 2026-05-05
During the three months ended March 31, 2026, certain of our officers and directors adopted, terminated or modified trading plans for the sale of PSEG common stock which are intended to satisfy the affirmative defense of Rule 10b5-1(c) of the Exchange Act, as shown in the following table:
(A) Expires on the date shown or such earlier date upon the completion of all trades under the plan or the occurrence of such other termination events as specified in the plan, including but not limited to termination of the plan.
December 31, 2025 Form 10-K page 11. In March 2026, FERC issued an order addressing a longstanding dispute about the methodology used in PJM to calculate and assign transmission project costs. The FERC order, among other things, rejected a proposed settlement agreement that would have shifted signif…
December 31, 2025 Form 10-K page 12. PJM operates a capacity market called the Reliability Pricing Model (RPM), the rules for which are approved by FERC. Over the past few years, RPM has been under considerable scrutiny at both the federal and state level as clearing prices in the capacity auctions …
In April 2026, FERC commenced an audit of PSE&G regarding its transmission formula rate. The audit will examine PSE&G’s compliance with (i) FERC accounting, record-keeping and record preservation rules, (ii) FERC Form No. 1 and related quarterly reporting requirements and (iii) the company’s formula…
相对上期删除的文字 · 来源:10-Q · 2025-11-03
During the three months ended September 30, 2025, none of PSEG's officers or directors adopted, terminated or modified a Rule 10b5-1 trading arrangement or non-Rule 10b5-1 trading arrangement (as such terms are defined in Item 408 of Regulation S-K of the Securities Act of 1933).
Regulation of Wholesale Sales—Generation/Market Issues/Market Power
There are several ongoing proceedings at FERC that may impact future large load customer arrangements, such as data centers, including whether certain data center customers, depending on their configuration, will pay transmission service charges. FERC is also broadly examining issues concerning whet…
如何读 10-Q 的风险因素(第 1A 项)
10-Q 的风险因素章节有三种常见形态,本页按其一分类展示:
- 指向(pointer) — 公司仅声明"无重大变化"并指向年度 10-K 的完整风险因素;本季没有自己的风险文本可对比。
- 部分更新(partial) — 公司写明"除下述外无重大变化",只更新部分风险;摘录展示的正是本季新增的内容。
- 全文重述(restated) — 本季重新给出完整风险因素。若上一季只是"指向",则无法逐段对比,本页会将其标为"本季全文重述"。
这只是对文件结构的客观描述,不构成对风险高低的判断。
数据来自 SEC EDGAR 两份申报文件的文本级对比 · 确定性计算(无 AI 生成内容)· 仅供参考 · 非投资建议