对比:10-Q · 2026-08-10 与上一份 10-Q · 2026-04-30
| 章节 | 结果 | 新增 | 删除 | 微调 | 未变 |
|---|---|---|---|---|---|
| 管理层讨论与分析 | 文字有新增/删除 | +54 | −26 | ~37 | 70 |
| 市场风险(第3项) | 文字有新增/删除 | +1 | 0 | ~3 | 6 |
| 控制与程序 | 文字有新增/删除 | 0 | 0 | ~3 | 0 |
| 法律诉讼 | 无段落级文字变化 | 0 | 0 | 0 | 1 |
| 风险因素 | 部分风险因素更新 | +7 | 0 | ~1 | 0 |
| 其他信息 | 文字有新增/删除 | 0 | 0 | ~1 | 0 |
计数单位为段落;"新增/删除"指相对上一份文件新增/删除的文字,不含方向或好坏判断。
代表性摘录
每个章节最多 5 条、每条约 300 字符的原文摘录,直接来自两份 SEC 文件。
管理层讨论与分析
相对上期新增的文字 · 来源:10-Q · 2026-08-10
In January 2026, we announced the execution of the AMD Lease to provide 25 MW of critical IT load capacity at our Rockdale Facility. The AMD Lease has an initial term of ten years and provides three successive five-year term renewal options at the lessee’s discretion. The AMD Lease included an expan…
In August 2026, we announced the execution of the Tenant Lease to provide 191 MW of critical IT load capacity at the Rockdale Facility. The critical IT load capacity is anticipated to be delivered in phases in December 2027 and June 2028. The Tenant Lease has an initial term of 20 years and includes…
During the six months ended June 30, 2026, we continued to deploy miners across all our Facilities, with the objective of improving our operational efficiency and performance. As of June 30, 2026, we had a total deployed hash rate capacity of 44.4 EH/s, as compared to 38.5 EH/s as of December 31, 20…
During the six months ended June 30, 2026, we mined 3,060 bitcoin, reflecting an increase of 104 bitcoin compared to the 2,956 bitcoin mined during the six months ended June 30, 2025. The increase was primarily due to our increased average operating hash rate and significantly improved operational e…
For the six months ended June 30, 2026 and 2025, Bitcoin Mining revenue was $225.6 million and $283.7 million, respectively. The decrease of $58.1 million was primarily due to lower bitcoin prices during the 2026 period, which averaged $73,736 per bitcoin, as compared to $95,991 per bitcoin for the …
相对上期删除的文字 · 来源:10-Q · 2026-04-30
In January 2026, we announced the execution of the AMD Lease to provide 25 MW of critical IT load capacity at our Rockdale Facility. The AMD Lease has an initial term of ten years and provides for expansion options for up to an additional 75 MW of critical IT load capacity, as well as a right of fir…
During the three months ended March 31, 2026, we continued to deploy miners across all our Facilities, with the objective of improving our operational efficiency and performance. As of March 31, 2026, we had a total deployed hash rate capacity of 42.5 EH/s, as compared to 38.5 EH/s as of December 31…
During the three months ended March 31, 2026, we mined 1,473 bitcoin, reflecting a decrease of 57 bitcoin compared to the 1,530 bitcoin mined during the three months ended March 31, 2025. The decrease was primarily due to increases in the global network hash rate, partially offset by our increase in…
The following table presents our key Bitcoin Mining metrics:
Our Engineering business designs and manufactures power-distribution equipment and engineered-to-order electrical products. These products support our vertical integration strategy by enabling the internal development of critical electrical equipment and
市场风险(第3项)
相对上期新增的文字 · 来源:10-Q · 2026-08-10
power costs. While these strategies are intended to mitigate the impact of price volatility, significant increases in electricity costs or disruptions in power supply could still have a material adverse effect on our results of operations and financial condition.
风险因素
相对上期新增的文字 · 来源:10-Q · 2026-08-10
The following risk factor supersedes the similar risk factor previously disclosed in our 2025 Annual Report.
We are dependent on our electrical distribution provider, grid operator, and regulators for access to power, and we face electricity market risks relating to changes in laws, regulations, and market requirements that could have a material adverse effect on our financial condition, results of operati…
Our access to power is dependent on our electrical distribution providers, grid operators, and regulators, which collectively manage whether our operations are performing in accordance with market rules, requirements, and regulations. PUCT, ERCOT, and Oncor collectively oversee the regulatory, admin…
As the primary Texas grid operator, ERCOT is responsible for monitoring and testing market participants, including the Rockdale Facility and the Corsicana Facility, to assess their impact on grid reliability. In April 2022, ERCOT established a task force to review the participation of large flexible…
More recently, in 2025, the Texas legislature enacted Senate Bill (“SB”) 6 to support ERCOT’s grid reliability by, among other things, proposing minimum transmission rates on certain large loads and removing “phantom loads” from the interconnection queue to improve the accuracy of future load growth…
如何读 10-Q 的风险因素(第 1A 项)
10-Q 的风险因素章节有三种常见形态,本页按其一分类展示:
- 指向(pointer) — 公司仅声明"无重大变化"并指向年度 10-K 的完整风险因素;本季没有自己的风险文本可对比。
- 部分更新(partial) — 公司写明"除下述外无重大变化",只更新部分风险;摘录展示的正是本季新增的内容。
- 全文重述(restated) — 本季重新给出完整风险因素。若上一季只是"指向",则无法逐段对比,本页会将其标为"本季全文重述"。
这只是对文件结构的客观描述,不构成对风险高低的判断。