UEC 最新10-K变化
将 UEC 最新的定期申报(10-K/10-Q)与上一份同类型申报逐章节对比:每个章节新增/删除的段落数与原文摘录。全部为确定性文本对比——无相似度评分、无方向判断、非投资建议。
对比:10-K · 2026-09-29 与上一份 10-K · 2025-09-24
| 章节 | 结果 | 新增 | 删除 | 微调 | 未变 |
|---|---|---|---|---|---|
| 业务概况 | 文字有新增/删除 | +71 | −94 | ~4 | 3 |
| 风险因素 | 文字有新增/删除 | +110 | −116 | ~8 | 10 |
| 法律诉讼 | 文字有新增/删除 | +1 | −4 | 0 | 0 |
| 管理层讨论与分析 | 文字有新增/删除 | +91 | −63 | ~21 | 15 |
| 市场风险(第7A项) | 文字有新增/删除 | 0 | 0 | ~4 | 2 |
计数单位为段落;"新增/删除"指相对上一份文件新增/删除的文字,不含方向或好坏判断。
代表性摘录
每个章节最多 5 条、每条约 300 字符的原文摘录,直接来自两份 SEC 文件。
业务概况
相对上期新增的文字 · 来源:10-K · 2026-09-29
We are a uranium mining and development company. In August 2024, we re-commenced production at our Christensen Ranch ISR project in Wyoming and, in April 2026, we commenced production at our Burke Hollow ISR mine in South Texas.
We have three ISR mining “hub and spoke” platforms, one in South Texas and two in Wyoming. We operate out of two of these platforms, anchored by fully licensed and operational uranium central processing plants (“CPPs”): our Hobson CPP located in Texas and our Irigaray CPP located in Wyoming. The thi…
We have a significant uranium resource base and have licensed production capacity of approximately 12.1 million pounds per year across our Wyoming and South Texas platforms.
In Canada, we control one of the most extensive land and resource portfolios in the Athabasca Basin, anchored by the Roughrider Project (as defined below) in Saskatchewan.
Through our wholly owned subsidiary, United States Uranium Refining & Conversion Corp. (“UR&C”), we are pursuing domestic refining and conversion capabilities to further strengthen the U.S. nuclear fuel supply chain.
相对上期删除的文字 · 来源:10-K · 2025-09-24
Uranium Energy Corp. is a fast growing, uranium mining company listed on the NYSE American. UEC is working towards fueling the global demand for carbon-free nuclear energy, a key solution to climate change, and energy source for the low-carbon future.
UEC is a pure-play uranium company and is advancing its next generation of low-cost, in-situ recovery (“ISR”) mining uranium projects, and which ISR mining process is expected to reduce the impact on the environment as compared to conventional mining. We have two extraction ready ISR hub and spoke p…
We believe nuclear energy will continue to be an important part of the energy transition and the energy mix of a future low carbon economy. As such, we are focused on scaling our business to meet the future energy needs for nuclear in the U.S. and globally.
Uranium Energy Corp. was incorporated under the laws of the State of Nevada on May 16, 2003 under the name Carlin Gold Inc. During 2004, we changed our business operations and focus from precious metals exploration to uranium exploration in the U.S. Our principal executive office and corporate headq…
We are primarily engaged in uranium mining and related activities, including exploration, pre-extraction, extraction and processing, on uranium projects located in the United States, Canada and the Republic of Paraguay. We utilize ISR mining where possible which we believe, when compared to conventi…
风险因素
相对上期新增的文字 · 来源:10-K · 2026-09-29
An investment in the shares of our common stock or other securities is subject to risks inherent in our businesses and the industries in which we operate. We describe below certain risks and uncertainties, the occurrences of which could have a material adverse effect on us. The risks and uncertainti…
Our operations are capital intensive and we will require significant additional financing to continue with our exploration, pre-extraction and extraction activities on our existing projects and to acquire additional mineral projects. Further, we have a history of negative operating cash flow and net…
Our operations are capital intensive and future capital expenditures are expected to be substantial. We will require significant additional financing to fund our operations, including acquiring additional mineral projects and continuing our exploration, pre-extraction and extraction activities. Hist…
Our reliance on equity and debt financings is expected to continue for the foreseeable future, and their availability whenever such additional financing is required will be dependent on many factors beyond our control including, but not limited to, the market price of uranium, the continuing public …
In August 2024, we restarted uranium extraction at our fully permitted, and past producing, Christensen Ranch Mine ISR operation in Wyoming, and in April 2026, we commenced uranium extraction at our Burke Hollow Mine ISR operation in Texas. The ramp-up phase at these projects will continue while new…
相对上期删除的文字 · 来源:10-K · 2025-09-24
In addition to the information contained in this Annual Report, we have identified the following material risks and uncertainties which reflect our outlook and conditions known to us as of the date of this Annual Report. These material risks and uncertainties should be carefully reviewed by our stoc…
There is no assurance that we will be successful in preventing the material adverse effects that any one or more of the following material risks and uncertainties may cause on our business, prospects, financial condition and operating results, which may result in a significant decrease in the market…
Our operations are capital intensive and we will require significant additional financing to acquire additional mineral projects and continue with our exploration, pre-extraction and extraction activities on our existing projects.
Our operations are capital intensive and future capital expenditures are expected to be substantial. We will require significant additional financing to fund our operations, including acquiring additional mineral projects and continuing with our exploration, pre-extraction and extraction activities …
We are primarily engaged in uranium mining and related activities, including exploration, pre-extraction, extraction and processing, on projects primarily located in the U.S. and Canada. In November 2010, we commenced uranium extraction for the first time at our Palangana Mine utilizing ISR methods …
法律诉讼
相对上期新增的文字 · 来源:10-K · 2026-09-29
As of the date of this Annual Report, other than routine litigation incidental to our business, we are not currently a party to any material pending legal proceedings that management believes would be likely to have a material adverse effect on our financial position, results of operations or cash f…
相对上期删除的文字 · 来源:10-K · 2025-09-24
As of the date of this Annual Report, other than routine litigation incidental to our business or as disclosed below, we are not currently a party to any material pending legal proceedings that management believes would be likely to have a material adverse effect on our financial position, results o…
On or about March 9, 2011, the TCEQ granted our Company’s applications for a Class III Injection Well Permit, Permit Area Authorization and Aquifer Exemption (“AE”) for our Goliad Project. On or about December 4, 2012, the EPA concurred with the TCEQ issuance of the AE permit. With the receipt of th…
A Class I renewal application for the Goliad Project disposal wells was received by the TCEQ on January 23, 2020 and declared administratively complete on April 27, 2020. The application went through technical review and, on September 13, 2022, the executive director of the TCEQ made a decision that…
The Company has had communications and filings with the Ministry of Public Works and Communications (“MOPC”), the mining regulator in Paraguay, whereby the MOPC is taking the position that certain concessions forming part of the Company’s Yuty, Alto Parana and Colonel Oviedo Projects are not eligibl…
管理层讨论与分析
相对上期新增的文字 · 来源:10-K · 2026-09-29
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) provides information that management believes is relevant to an assessment and understanding of the Company’s consolidated financial condition and results of operations. We use certain non-GA…
In August 2024, we restarted uranium extraction at our fully permitted, and past producing, Christensen Ranch Mine ISR operation in Wyoming. During Fiscal 2025, our initial production as part of ramp up yielded 129,966 pounds of precipitated uranium and dried and drummed U3O8 (uranium concentrate). …
At Ludeman, our next ISR project, the previously announced 240-hole delineation drill program was completed. Monitor, injection, and recovery wells for the first wellfield are under construction and being tested for mechanical integrity. Additionally, core samples were collected for laboratory testi…
Uranium recovered from our Christensen Ranch Mine is processed at our Irigaray CPP, which has a licensed production capacity of four million pounds of U3O8 per year. The Irigaray CPP is the hub central to our four fully permitted ISR projects located in the PRB, including our Christensen Ranch Mine …
On August 1, 2025, our Sweetwater Project was designated as a FAST-41 transparency project by the U.S. Federal Permitting Improvement “Steering Council” as part of the implementation of President Trump’s Executive Order on Immediate Measures to “Increase American Mineral Production”. Our first miles…
相对上期删除的文字 · 来源:10-K · 2025-09-24
(Expressed in thousands of U.S. dollars, except per share amounts)
The following discussion summarizes the results of operations for each of our fiscal years ended July 31, 2025, 2024 and 2023 and our financial condition as at July 31, 2025 and 2024, with a particular emphasis on Fiscal 2025, our most recently completed fiscal year.
We utilize ISR mining for our uranium projects where possible which we believe, when compared to conventional open pit or underground mining, requires lower capital and operating expenditures with a shorter lead time to extraction and a reduced impact on the environment. At July 31, 2025, we had no …
In August 2024, we restarted uranium extraction at our fully permitted, and past producing, Christensen Ranch Mine ISR operation in Wyoming. During Fiscal 2025, our initial production as part of ramp up yielded 103,545 pounds and 26,421 pounds of precipitated uranium and dried and drummed concentrat…
Our fully-licensed and 100% owned Hobson processing facility forms the basis for our regional operating strategy in the State of Texas, specifically the South Texas Uranium Belt, where we utilize ISR mining. We utilize a “hub-and-spoke” strategy whereby the Hobson processing facility, which has a ph…
如何读 10-Q 的风险因素(第 1A 项)
10-Q 的风险因素章节有三种常见形态,本页按其一分类展示:
- 指向(pointer) — 公司仅声明"无重大变化"并指向年度 10-K 的完整风险因素;本季没有自己的风险文本可对比。
- 部分更新(partial) — 公司写明"除下述外无重大变化",只更新部分风险;摘录展示的正是本季新增的内容。
- 全文重述(restated) — 本季重新给出完整风险因素。若上一季只是"指向",则无法逐段对比,本页会将其标为"本季全文重述"。
这只是对文件结构的客观描述,不构成对风险高低的判断。
数据来自 SEC EDGAR 两份申报文件的文本级对比 · 确定性计算(无 AI 生成内容)· 仅供参考 · 非投资建议