URG 最新10-Q变化
将 URG 最新的定期申报(10-K/10-Q)与上一份同类型申报逐章节对比:每个章节新增/删除的段落数与原文摘录。全部为确定性文本对比——无相似度评分、无方向判断、非投资建议。
对比:10-Q · 2026-05-08 与上一份 10-Q · 2025-11-03
| 章节 | 结果 | 新增 | 删除 | 微调 | 未变 |
|---|---|---|---|---|---|
| 管理层讨论与分析 | 文字有新增/删除 | +112 | −103 | ~7 | 9 |
| 市场风险(第3项) | 文字有新增/删除 | 0 | 0 | ~4 | 2 |
| 控制与程序 | 文字有新增/删除 | 0 | 0 | ~1 | 1 |
| 法律诉讼 | 文字有新增/删除 | +1 | −1 | 0 | 0 |
| 风险因素 | 公司称无重大变化(指向 10-K) | — | — | — | — |
| 其他信息 | 文字有新增/删除 | 0 | 0 | ~1 | 0 |
计数单位为段落;"新增/删除"指相对上一份文件新增/删除的文字,不含方向或好坏判断。
代表性摘录
每个章节最多 5 条、每条约 300 字符的原文摘录,直接来自两份 SEC 文件。
管理层讨论与分析
相对上期新增的文字 · 来源:10-Q · 2026-05-08
We utilize ISR to recover uranium at our Lost Creek Property and Shirley Basin Project, which are both located in Wyoming, and will do so at other projects where possible. The ISR technique is employed in uranium extraction because it allows for an effective recovery of roll front uranium mineraliza…
At Lost Creek, we extract and process uranium oxide (“U3O8”) at the Lost Creek processing facility, which includes all circuits for the production, drying, and drumming (packaging) of U3O8. After processing, drying, and drumming, U3O8 is shipped from Lost Creek to a third-party conversion facility t…
In April 2026, we commenced initial operations to extract and capture U3O8 at Shirley Basin. The Shirley Basin Project is designed as a satellite facility. The Lost Creek processing facility will be utilized to process U3O8 that is extracted and captured on resin (plastic beads that attract and bind…
Successful production operations depend on strong safety programs. Our safety performance and culture at Lost Creek and Shirley Basin have continued to improve, and we remain focused on safety and compliance throughout our operations.
Our combined licensed capacity at Lost Creek and Shirley Basin totals 4.2 million pounds of U3O8 per year. This includes licensed annual capacity at the Lost Creek processing facility of up to 2.2 million pounds of U3O8 slurry and/or dried U3O8, of which up to 1.2 million pounds of U3O8 may be produ…
相对上期删除的文字 · 来源:10-Q · 2025-11-03
We utilize in situ recovery (“ISR”) of the uranium at our flagship project, Lost Creek, and will do so at Shirley Basin and other projects where possible. The ISR technique is employed in uranium extraction because it allows for an effective recovery of roll front uranium mineralization at a lower c…
Our Lost Creek Project is permitted and licensed for annual recovery of up to 1.2 million pounds U3O8. The processing facility at Lost Creek, which includes all circuits for the production, drying and packaging of U3O8 for delivery into sales transactions, is designed and approved under current lice…
Our sales deliveries in 2025 are projected to be 440,000 pounds U3O8 into two of our sales agreements. We anticipate completing the remaining deliveries in Q4 with our existing conversion facility inventory. We now have eight multi-year sales agreements which together anticipate sales of approximate…
The Trump Administration continues with its strong support for energy and mineral development which began on day one of the Administration with the Executive Order titled “Unleashing American Energy.” The Order makes it U.S. policy to encourage energy exploration and production. Support for energy p…
President Trump issued four Executive Orders in May 2025 with the objective of taking “swift and decisive action” to rapidly advance U.S. nuclear power generation and global nuclear influence in the interest of America’s national security. The Executive Orders call for 10 new large reactors to be un…
法律诉讼
相对上期新增的文字 · 来源:10-Q · 2026-05-08
We are not aware of any material pending or threatened litigation or of any proceedings known to be contemplated by governmental authorities that are or would be likely to have a material adverse effect upon us or our operations, taken as a whole, that was not disclosed in the Company’s Annual Repor…
相对上期删除的文字 · 来源:10-Q · 2025-11-03
No new legal proceedings or material developments in pending proceedings.
如何读 10-Q 的风险因素(第 1A 项)
10-Q 的风险因素章节有三种常见形态,本页按其一分类展示:
- 指向(pointer) — 公司仅声明"无重大变化"并指向年度 10-K 的完整风险因素;本季没有自己的风险文本可对比。
- 部分更新(partial) — 公司写明"除下述外无重大变化",只更新部分风险;摘录展示的正是本季新增的内容。
- 全文重述(restated) — 本季重新给出完整风险因素。若上一季只是"指向",则无法逐段对比,本页会将其标为"本季全文重述"。
这只是对文件结构的客观描述,不构成对风险高低的判断。
数据来自 SEC EDGAR 两份申报文件的文本级对比 · 确定性计算(无 AI 生成内容)· 仅供参考 · 非投资建议