WYFI 最新10-Q变化
将 WYFI 最新的定期申报(10-K/10-Q)与上一份同类型申报逐章节对比:每个章节新增/删除的段落数与原文摘录。全部为确定性文本对比——无相似度评分、无方向判断、非投资建议。
对比:10-Q · 2026-05-14 与上一份 10-Q · 2025-11-13
| 章节 | 结果 | 新增 | 删除 | 微调 | 未变 |
|---|---|---|---|---|---|
| 管理层讨论与分析 | 文字有新增/删除 | +85 | −84 | ~24 | 44 |
| 市场风险(第3项) | 无段落级文字变化 | 0 | 0 | 0 | 1 |
| 控制与程序 | 文字有新增/删除 | +1 | −1 | ~1 | 2 |
| 法律诉讼 | 文字有新增/删除 | 0 | 0 | ~1 | 0 |
| 风险因素 | 公司称无重大变化(指向 10-K) | — | — | — | — |
| 其他信息 | 文字有新增/删除 | +5 | −1 | 0 | 0 |
计数单位为段落;"新增/删除"指相对上一份文件新增/删除的文字,不含方向或好坏判断。
代表性摘录
每个章节最多 5 条、每条约 300 字符的原文摘录,直接来自两份 SEC 文件。
管理层讨论与分析
相对上期新增的文字 · 来源:10-Q · 2026-05-14
Our business model integrates our data center infrastructure and cloud services to provide scalable, high-performance computing solutions for enterprises, research institutions, and AI and ML driven businesses. Our integrated approach aligns specialized data center operations with GPU-focused cloud …
Based on their collective industry experience, our data center team is adept at bringing new sites online on an accelerated timeline. We are aggressively pursuing our development pipeline and intend to achieve an estimated 76 MW (gross) of total data center capacity by the end of the fourth quarter …
We use a well-defined set of criteria to select our data center sites. We typically target sites with proximity to metro areas and partial infrastructure in place, where we are retrofitting rather than developing greenfield projects. Metropolitan areas are positioned for low-latency to address long-…
We acquired Enovum on October 11, 2024. The transaction included the lease of MTL-1, our 4 MW (gross) Tier-3 high-performance computing (“HPC”) data center in Montreal, Canada, which was fully operational and fully leased to customers at the time of acquisition.
On December 27, 2024, we acquired the real estate and building for a build-to-suit 5 MW (gross) Tier-3 data center expansion project near Montreal, Canada which we refer to as MTL-2. MTL-2, a 160,000 square foot site that was previously used as an encapsulation manufacturing facility, is located in …
相对上期删除的文字 · 来源:10-Q · 2025-11-13
On July 30, 2025, we entered into a Contribution Agreement with Bit Digital, pursuant to which Bit Digital agreed to contribute its HPC business through the transfer of 100% of the capital shares of its cloud services subsidiary, WhiteFiber AI, Inc. and its wholly-owned subsidiaries WhiteFiber HPC, …
We acquired Enovum Data Centers Corp (“Enovum”) on October 11, 2024. The transaction included the lease to MTL-1, a fully operational and fully leased to customers 4 MW (gross) Tier-3 datacenter headquartered in Montreal, Canada.
On December 27, 2024, we acquired the real estate and building for a build-to-suit 5 MW (gross) Tier-3 data center expansion project near Montreal, Canada which we refer to as MTL-2. MTL-2, a 160,000 square foot site that was previously used as an encapsulation manufacturing facility, is located in …
On April 11, 2025, we entered into a lease for a new data center site in Saint-Jerome, Quebec, a suburb of Montreal, MTL-3. The MTL-3 facility spans approximately 202,000 square feet on 7.7 acres and is being developed to as a 7 MW (gross) Tier-3 data center. It will support current contracted capac…
On May 20, 2025 (the “Closing Date”), we completed the purchase of a former industrial/manufacturing building from Unifi Manufacturing, Inc. (“UMI”). Pursuant to the Purchase Agreement we agreed to purchase from UMI, an industrial/manufacturing building together with the underlying land (“NC-1”) loc…
控制与程序
相对上期新增的文字 · 来源:10-Q · 2026-05-14
There have been no changes in the Company’s internal control over financial reporting during the quarter-ended March 31, 2026 that have materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.
相对上期删除的文字 · 来源:10-Q · 2025-11-13
In October 2024, we acquired 100% of the equity interests of Enovum Data Centers Corp (“Enovum”). We are currently in the process of integrating Enovum’s operations, control processes, and information systems into our systems and control environment and expect to include them in scope of design and …
其他信息
相对上期新增的文字 · 来源:10-Q · 2026-05-14
Amendment and Replacement of Royal Bank of Canada Credit Facility
On April 27, 2026, the Company entered into an amended credit agreement with RBC. This agreement replaces the original credit agreement dated June 18, 2025, as subsequently amended on July 4, 2025. The amended credit agreement provides an authorized credit facility of CAD $28 million (approximately …
Additionally, RBC is providing a CAD $8 million (approximately $5.8 million) revolving facility in the form of Letters of Credit and Letters of Guarantee. The fees will be determined on a transaction-by-transaction basis, and the facility will be available for a 12-month term.
As of the reporting date, the April 27, 2026 bridge loan has been authorized and funded by RBC for the MTL-3 facility acquisition. The Company and RBC are currently in discussions regarding new syndicated credit facilities, including (i) a delayed draw term loan facility of CAD $115 million (approxi…
During the three months ended March 31, 2026, no director or officer of the Company adopted or terminated a “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408(a) of Regulation S-K, nor did the Company during such fiscal quarter adopt or te…
相对上期删除的文字 · 来源:10-Q · 2025-11-13
During the three months ended September 30, 2025, no director or officer of the Company adopted or terminated a “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408(a) of Regulation S-K, nor did the Company during such fiscal quarter adopt o…
如何读 10-Q 的风险因素(第 1A 项)
10-Q 的风险因素章节有三种常见形态,本页按其一分类展示:
- 指向(pointer) — 公司仅声明"无重大变化"并指向年度 10-K 的完整风险因素;本季没有自己的风险文本可对比。
- 部分更新(partial) — 公司写明"除下述外无重大变化",只更新部分风险;摘录展示的正是本季新增的内容。
- 全文重述(restated) — 本季重新给出完整风险因素。若上一季只是"指向",则无法逐段对比,本页会将其标为"本季全文重述"。
这只是对文件结构的客观描述,不构成对风险高低的判断。
数据来自 SEC EDGAR 两份申报文件的文本级对比 · 确定性计算(无 AI 生成内容)· 仅供参考 · 非投资建议