IDA 最新10-Q变化
将 IDA 最新的定期申报(10-K/10-Q)与上一份同类型申报逐章节对比:每个章节新增/删除的段落数与原文摘录。全部为确定性文本对比——无相似度评分、无方向判断、非投资建议。
对比:10-Q · 2026-07-30 与上一份 10-Q · 2026-04-30
| 章节 | 结果 | 新增 | 删除 | 微调 | 未变 |
|---|---|---|---|---|---|
| 管理层讨论与分析 | 文字有新增/删除 | +87 | −66 | ~54 | 70 |
| 市场风险(第3项) | 文字有新增/删除 | 0 | 0 | ~6 | 3 |
| 控制与程序 | 文字有新增/删除 | 0 | 0 | ~3 | 0 |
| 风险因素 | 无段落级文字变化 | 0 | 0 | 0 | 1 |
| 其他信息 | 文字有新增/删除 | 0 | 0 | ~1 | 0 |
计数单位为段落;"新增/删除"指相对上一份文件新增/删除的文字,不含方向或好坏判断。
未列出(无法可靠提取或缺失):法律诉讼
代表性摘录
每个章节最多 5 条、每条约 300 字符的原文摘录,直接来自两份 SEC 文件。
管理层讨论与分析
相对上期新增的文字 · 来源:10-Q · 2026-07-30
◦In March, Idaho Power filed a CPCN request for a 222 MW natural gas-fueled facility, with an expected in-service date in 2029, and for a 430 MW natural gas-fueled facility, with an expected in-service date in 2030. As of the date of this report, the CPCN request remains subject to regulatory approv…
◦Also in March, the IPUC approved Idaho Power's agreement to purchase the output of an 80 MW solar facility, with a scheduled online date of June 2027, and Idaho Power's CPCN request for 167 MW of natural gas-fueled generating capacity next to the existing Bennett Mountain power plant, with an expec…
◦In April, Idaho Power, jointly with co-owner PacifiCorp, filed a CPCN request for Segment E-8 for the GWW transmission line, with an expected in-service date for the entire segment in 2030 or later. As of the date of this report, the CPCN request remains subject to regulatory approval.
◦In June, Idaho Power filed an application with the IPUC for an order approving a 20-year PPA with Bluebird Solar Project LLC, supplying up to 200 MW of output to Idaho Power, along with a 20-year energy storage system tolling agreement for 100 MW of dispatchable energy storage capacity. Both are ex…
◦The conversion of unit 2 at the North Valmy power plant from coal to natural gas was completed in June, ending all coal-fired generation at the plant.
相对上期删除的文字 · 来源:10-Q · 2026-04-30
◦In March, the IPUC approved Idaho Power's agreement to purchase the output of an 80 MW solar facility, with a scheduled online date of June 2027.
◦In March, the IPUC approved Idaho Power's CPCN request for 167 MW of natural gas-fueled generating capacity next to the existing Bennett Mountain power plant, with an expected in-service date in 2028.
◦In March, Idaho Power filed a CPCN request with the IPUC for a 222 MW natural gas-fueled facility, with an expected in-service date in 2029 and a 430 MW natural gas-fueled facility, with an expected in-service date in 2030. As of the date of this report, both requests are pending IPUC approval.
◦In April, Idaho Power, jointly with co-owner PacifiCorp, filed a CPCN request for Segment E-8 for the GWW transmission line, which would create up to 2,000 MW of additional transmission capacity and the ability to interconnect new generation resources across Idaho.
The following is a summary of Idaho Power's net income, net income attributable to IDACORP, and IDACORP's earnings per diluted share (in thousands of dollars and shares, except earnings per share amounts):
如何读 10-Q 的风险因素(第 1A 项)
10-Q 的风险因素章节有三种常见形态,本页按其一分类展示:
- 指向(pointer) — 公司仅声明"无重大变化"并指向年度 10-K 的完整风险因素;本季没有自己的风险文本可对比。
- 部分更新(partial) — 公司写明"除下述外无重大变化",只更新部分风险;摘录展示的正是本季新增的内容。
- 全文重述(restated) — 本季重新给出完整风险因素。若上一季只是"指向",则无法逐段对比,本页会将其标为"本季全文重述"。
这只是对文件结构的客观描述,不构成对风险高低的判断。
数据来自 SEC EDGAR 两份申报文件的文本级对比 · 确定性计算(无 AI 生成内容)· 仅供参考 · 非投资建议